Nuclear Monitor Issue: 
#746, 747, 748
Waste special
01/05/2012
Article

Pakistan

Nr. of reactors

first grid connection

% of total electricity 

3

2000-06-13

3.77

The Pakistan Atomic Energy Commission (PAEC) has responsibility for radioactive waste management. A Radioactive Waste Management Fund is proposed in a new proposed policy. Waste Management Centers are proposed for Karachi and Chashma.(*01) The low and intermediate level waste (short-lived) will be conditioned for pre-disposal and stored on site. After a period of time, this waste will be transported to a low and intermediate level waste disposal facility for permanent disposal.

The spent fuel from the reactors is presently stored in spent fuel pools at the plant site. It is planned that at each plant site Dry Storage Facilities will be established. The spent fuel which has cooled for over 10 years will be removed from  the pool and placed in Dry Storage. It is expected that the Dry Storage Facility will be licensed for 50 years or more.

Although Pakistan is not reprocessing its spent fuel from nuclear power plants, it has not yet declared it as waste. With increasing uranium prices, it may be feasible in the future to use the spent fuel as a resource and it may be reprocessed (under IAEA safeguards) to obtain material to be used in the production of mixed fuel. Therefore, at present, the decision to put the spent fuel in a non-retrievable Deep Geological Repository is postponed.(*02)

Although there is no sizable civil society, there are examples of people opposing nuclear developments, especially when nuclear waste is involved. This is also admitted by Tariq Bin Tahir Director General Nuclear Power Waste, PAEC, at a presentation at the World Nuclear Association in 2007. Speaking about the need for a disposal facility for low and intermediate waste: “Whereas there is no significant opposition when it comes to selecting a site for a nuclear power plant, siting for a waste site attracts an immediate negative response from the public. (…) The site selection therefore has more to do with socio-political acceptance rather than best technical choice.” Nevertheless, a number of sites are under consideration and, he expects that the disposal facility will start receiving waste in 6 years.(*03) But not much progress is made, because in 2008 a timeframe was mentioned of 8-11 years for a near-surface LILW-facility.(*04)

Also in 2008, at the same presentation, a time frame was published for a geological disposal facility for high-level waste and spent fuel (28-35 years), although it was unclear of the first phase, area survey and site characterization, had already started.

It looks like not much is happening: in one of the latest reports available on the PAEC website(*05) it is only mentioned that work remained in progress in 2009 on “Draft National Policy on Control and Safe Management of Radioactive Waste”. The Draft Policy aims at “establishing a national commitment to control and manage radioactive waste generated in the country in accordance with national legislation/regulations and international standards.” The construction of a dry spent fuel storage facility is still 'planned'

Romania

Nr. of reactors

first grid connection

% of total electricity 

2

1996-07-11

18.98%

Baita Bihor repository started operation in 1985 and is a disposal facility for low en intermediate-level waste from industry, medicine and research activities. Disposal galleries are former uranium exploration galleries that have been enlarged. A new near-surface repository is under consideration at Saligny, inside the exclusion zone of the nuclear power plant. A feasibility study is prepared. The conceptual design is similar to those of L’Aube (France), El Cabril (Spain) repositories. (*01)

Used fuel is stored at the reactors for up to ten years. It is then transferred to the Interim Spent Fuel Storage Facility (DICA), a dry storage facility for spent fuel based on the Macstor system designed by AECL for about 50 years. The first module was commissioned in 2003. Regarding the spent fuel from research reactors policy is return to the country of origin and/or deep geological disposal in the national repository. No reprocessing takes place.

The research of the geological environment for a deep geological repository of spent fuel and high-level waste, which should be available around 2055 is at a very preliminary stage.(*02) In the 1990’s, studies identified as potential host rock the following geological formations: salt, volcanic tuff, granite, shield green slate – Moesian Platform, clay. One to several potential host rock were identified in each geological formation. Over the last years, several R&D studies on general aspects of studying host rocks for a geological repository and general reference design concepts were performed by different organizations within the national R&D supported programs. (*03)

Since Romania is a country with a small nuclear energy program the preliminary estimation of the costs for sitting and construction of a deep geological disposal for spent fuel and long lived waste in a national repository are extremely high. This is the reason for Romania to consider that deep geological disposal in an international repository "could be a better solution for avoidance of leaving unfair burden for future generations," according to a 2003 statement.(*04)

Russian Federation

Nr. of reactors

first grid connection

% of total electricity 

33

1954-06-26

17.59%

Russia will soon start storing spent fuel in a new centralized 'dry' interim storage facility (ISF) at Zheleznogorsk, near Krasnoyarsk. The first phase of the facility, for RBMK-fuel, was completed December 2011, and the first fuel was planned to in March 2012. Reprocessing has always been a major part of waste management. The Russian Federation (and its predecessor the Soviet Union) is the champion of sea dumping. It dumped low and intermediate level waste in Arctic Seas (1964-1991): liquid radioactive waste in Arctic Seas (1959-1991); objects with spent nuclear fuel in Arctic Seas (1965-1981); liquid (1966-1992) and solid (19680-1992) waste in the Pacific Ocean; liquid waste in Barents Sea and Far Eastern Seas (1992) and finally, liquid radioactive waste in Sea of Japan (1993).)(*01). The Russian state nuclear corporation Rosatom is responsible for waste management, but in March 2012, a National Operator for management of radioactive waste was established in accordance with the “Federal Law on the Radioactive Waste management” signed in summer 2011.(*02)

Interim storage and reprocessing
Russia needs to build a centralized long-term dry storage due to the limited capacity of existing storage pools. In 19 December 2011, the first phase of a centralized storage facility has been completed at the Mining and Chemical Combine (MCC) at Zheleznogorsk. The initial stage of the facility will be used for storing 8129 metric tons of RBMK fuel from Leningrad (4 units), Kursk (5) and Smolensk (3 reactors). The used fuel from these plants is currently stored in on-site cooling pools, but these are reaching full-capacity, and spent fuel discharges are expected to exceed on site storage capacity. (*03)

The second stage of the facility, for VVER-fuel, is now beginning. Later, used VVER-1000 fuel from reactors at the Balakovo, Kalinin, Novovoronezh and Rostov plants will also be stored at the facility. VVER fuel has already been sent to Zheleznogorsk for storage in water pools. The ISF - measuring some 270 meters in length, 35 meters wide and 40 meters high - will ultimately hold 38,000 tons of used RBMK and VVER fuel.

The fuel will be stored in the facility for up to 50 years,(*04) during which time substantial reprocessing capacity should be brought online. Currently, Russia reprocesses about 16% of the used fuel produced each year, but Russia aims to reprocess 100% in the year 2020.(*05)

In the long-term, a geological repository for high-level radioactive waste is planned.

No waste repository is yet available, though site selection is proceeding in granite on the Kola Peninsula. In 2003 Krasnokamensk in the Chita region 7000 km east of Moscow was suggested as the site for a major spent fuel repository. (*06)

Since the early 1970s, Minatom (Ministry of Atomic Energy) has been studying various sites and geologic formations to determine their suitability for use in the construction of underground radioactive waste isolation facilities. According to the regional approach that has been developed in Russia with regard to the selection of geologic sites for permanent isolation, it is most expedient to have the burial sites near the waste sources. Purposeful research for the high-level waste geological isolation has been done in the two areas where the Mayak Production Association (Chelyabinsk Oblast) and the Mining-Chemical Complex are located. After the results of all research studies were analyzed, two sites nearby Mayak reprocessing plant were selected as top priorities.

A second Russian geological isolation site is the Nizhnekansk granitoid massif, one of the largest massifs in central Siberia, very close to the MCM. It is composed of various types of magmatic and metamorphic rock. Here, also two specific sites were selected. In 2005, however, because of a lack of financing, work on the study at the two Nizhnekansk sites was halted. (*07)

Then in 2008 the Nizhnekansky sites were on the table again as a site for a national deep geological repository. Rosatom said the terms of reference for the facility construction would be tabled by 2015 to start design activities and set up an underground rock laboratory. A decision on construction is due by 2025, and the facility itself is to be completed by 2035.(*08)

Although the import of foreign fuel for the purpose of final disposal is prohibited, much Russian-origin spent fuel is imported. In the 1990s contracts for fuel for reprocessing, has been signed with Ukraine, Bulgaria (both for spent fuel from nuclear power plants), Uzbekistan, Kazakhstan, Czech Republic and Latvia (spent fuel form research reactors). The contracts envisage the return of the solidified radioactive waste resulting from the reprocessing. (*09) During Soviet times, spent fuel from VVER-440 reactors in Finland, Hungary, Bulgaria and Slovakia was shipped to Mayak for reprocessing. (*10)

The reprocessing waste from Russian-origin fuel can be left in Russia. Most of the Russian-origin fuel that Russia has repatriated has not been reprocessed in Russia's existing reprocessing plant, however, but is in long-term storage pending the construction of a larger reprocessing plant.(*11)

Slovak Republic

Nr. of reactors

first grid connection

% of total electricity 

4

1972-12-25

54.02%

The state regulation over nuclear safety for radioactive waste and spent fuel management is entrusted to the Nuclear Regulatory Authority of Slovak Republic (ÚJD SR) established on 1 January 1993.(*01)

Low and intermediate level waste is stored at a near-surface disposal facility in Mochovche. Selection of the site has been carried out between 1975-1979 out of 34 sites. Permission was granted in1999 and operation started in 2001.(*02)

Spent fuel was transported prior to 1987 to Soviet Union for storage and reprocessing: all spent fuel from Bohunice A-1  as well as VVER-440 fuel. Currently spent fuel is not reprocessed.

Waste management strategy is long-term interim storage (40-50) years at a facility at Bohunice, called MSVP, in pools. MSV is in operation since  1987.(*03)

Looking for international solution
Slovakia started its own program of development of deep geological disposal in 1996. Fifteen potentially suitable areas for further investigation were identified, later narrowed to three distinct areas: with five localities: three in granitoid rocks, two in sedimentary rocks environment.(*04)

The research program had been stopped in 2001,(*05) however, and a new strategy had been specified by the government in 2008: disposal in deep geological repository; international solution (export to Russian Federation, international repository); zero alternative, interim storage for a further not specified period of time (“wait and see“ approach).(*06)

The handling of spent fuel after interim storage has not been defined in the Slovak Republic. It can be assumed that this will hamper the determined search for a location for a repository and for the development of a repository concept. According the original plans, decision on selection of the host environment was expected after 2005, selection of a candidate site around 2010, and commissioning of a deep geological repository by 2037.(*07) This has now been postponed for an indefinite period of time.

There is no definition, whether the five locations shall be further explored in case of a decision for a Slovak repository. A time schedule for the further procedure is not stipulated as far as publicly known.(*08)

Slovenia

Nr. of reactors

first grid connection

% of total electricity 

1

1981-10-02

41.73%

The Agency for Radwaste Management is the state-owned public service for radioactive waste management. It is financed through the national budget and partially through the Fund for the Decommissioning of the Krško nuclear power plant. Operational low and intermediate-level wastes are stored on site of the Krsko nuclear power plant, as is used fuel. (*01

A permanent repository for low- and intermediate-level wastes is due to open in 2013 at Vrbina, near the Krsko plant. Site selection has been undertaken over five years, and compensation of 5 million euro per year will be paid to the local community. Vrbina is only for Slovenia's portion of the waste, although it could be doubled in case of an agreement between with Croatia or further use of nuclear power. It will also hold all of Slovenia's industrial and medical radioactive waste as well as the LLW and ILW from the 250 kW research reactor at the Josef Stefan Institute in Ljubljana.(*02)

The 2006 long-term strategy for spent fuel management foresees spent fuel storage in dry casks. Spent fuel will be moved to dry storage between 2024 and 2030 and will be stored until 2065, when a deep geological repository is assured. The operational phase of the spent fuel repository will end in 2070 and the repository should be closed in 2075. In the case of export option, the removal of spent fuel from dry storage is planned between 2066 and 2070. The option of multinational disposal is kept open.(*03)

A particular problem for waste management could be the fact that the reactor at Krško is operated jointly together with Croatia. Differing interests and responsibilities of the two countries may lead to problems when developing a Waste-Management Concept, or with respect to the financing of the Waste Management and to the determination of a location for the repository. The final disposal of the spent fuel is planned, however no efforts are visible regarding the realization.(*04)

References:

Pakistan
*01- World Nuclear Association: Nuclear Power in Pakistan, March 2012
*02- Director General Nuclear Power Waste, PAEC: Radioactive Waste Management Policy & Strategy of Pakistan, September 2007
*03- Tariq Bin Tahir, September 2007
*04- Bymanzur Hussain, Directorate General National Repository PAEC: Status of Radioactive Waste Disposal in Pakistan, April 2008
*05- Pakistan Nuclear Regulatory Authority (PNRA): Convention on Nuclear Safety, Report by the Government of the Islamic Republic of Pakistan for the Fifth Review Meeting, 2011, September 2010

Romania
*01- Nuclear Agency & Radioactive Waste (AN&DR):  Romania Nuclear Power Sector Reverse Trade Mission September 6 - 16, 2010 United States of America. Powerpoint presentation.
*02- European Commission: Radioactive Waste and Spent Fuel Management in the European Union, Seventh Situation Report, 22 August 2011, p.58
*03- Nuclear Agency & Radioactive Waste (AN&DR), September 2010
*04- Romania: Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, First National Report, March 2005

Russian Federation
*01- IAEA: Inventory of radioactive waste disposals at sea, IAEA-Tecdoc-1105, August 1999
*02- RIA Novosti, National Operator for radioactive waste management has been appointed, 2 April 2012
*03- Nuclear Fuel: Russia on track to complete spent fuel facility by 2015, 6 February 2012, 5
*04- World Nuclear News: Russia commissions fuel storage facility, 30 January 2012
*05- Nuclear Fuel, 6 February 2012
*06- World Nuclear Association: Russia's Nuclear Fuel Cycle, March 2012
*07- Tatyana A. Gupalo: Creation of Underground Laboratories at the Mining-Chemical Complex and at Mayak to Study the Suitability of Sites for Underground Isolation of Radioactive Wastes, published in: An International Spent Nuclear Fuel Storage Facility, The National Academies Press, 2005. p.240-247
*08- World Nuclear Association: Russia's Nuclear Fuel Cycle, March 2012
*09- Russian Federation: The National Report of the Russian Federation on Compliance with the obligations on the Joint Convention on the Safety of Spent Fuel Management and the Safety of Radioactive Waste Management, October 2008, p.97-98
*10- International Panel on Fissile Materials: Managing nuclear spent fuel from nuclear power reactors, 2011, p.73
*11- Bulletin of the Atomic Scientists, Managing nuclear spent fuel: Policy lessons from a 10-country study, 27 June 2011

Slovak Republic
*01- UJD: UJD SR established, company website
*02- OECD: Radioactive waste management programmes in OECD/NEA member countries: Slovak Republic, 2005, p. 5
*03- Slovak Republic: National Report of the Slovak Republic compiled in terms of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radwaste Management, August 2011
*04- Slovak Republic: Answers on questions on the National Report of the Slovak Republic, April 2009
*05- Wolfgang Neumann, Nuclear Waste Management in the EU, October 2010, p. 72
*06-  Slovak Republic, August 2011, p.95
*07- Slovak Republic, April 2009
*08- Wolfgang Neumann, October 2010

Slovenia
*01- Republic of Slovenia: Fourth Slovenian Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, October 2011
*02- World Nuclear News: Permanent store for Slovenian waste, 15 January 2010
*03- Republic of Slovenia:, October 2011, p.14
*04- Wolfgang Neumann: Nuclear Waste Management in the EU, October 2010, p 75

Central European nuclear renaissance stalling

Nuclear Monitor Issue: 
#723
6117
25/02/2011
Jan Haverkamp, Greenpeace EU energy campaigner
Article

Much of the nuclear renaissance talk of the last years was targeted at the EU new member states in Central Europe. The combination of centralized energy structures based on the pre-1989 planned economy, short links between politics and nuclear lobby and the need for re-powering because of the end of life-time of much of the current electricity generation capacity looked like the perfect backdrop for reviving old nuclear dreams.

Most of Central Europe, with the notable exception of Hungary and the Baltic States, survived the recent financial crisis quite well. Nevertheless, nuclear projects and plans are confronted increasingly with delays. Projects and plans in Poland, Slovakia, Lithuania, the Czech Republic, Romania and Bulgaria faced important complications and delays in the first months of 2011.

Visaginas, Lithuania – the ghost of Russia
Rosatom from Russia announced the start of construction in 2011 of the Kaliningrad and Belarus nuclear power stations. Even though these projects will probably be hit with a recently announced cut-back in Russian nuclear expansion, this has pushed plans for the Visaginas nuclear power station in Lithuania further backwards. The Lithuanian government fiercely protested the quality of Environmental Impact Assessments (EIAs) of both neighboring projects but this has not helped wooing strategic investors for Visaginas after Korean KEPKO withdrew from the project on December 6, 2010.

Cernavoda, Romania – strategic investors withdraw, fate of EIA uncertain
On 24 January, CEZ, GdF-Suez / Electrabel, RWE and Iberdrola officially withdrew from the project during the shareholder meeting of ElectroNuclear, the holding company of the project. This leaves only Romanian state utility Nuclearelectrica, ENEL from Italy and the Romanian branch of steel-giant Arcelor Mittal involved.

Three consortia were accepted in the tender for construction of this project: one led by US / Canadian engineering giant Bechtel, the second led by SNC Lavalin, the Canadian engineering company practically taking over much of what Canadian state owned AECL was involved in, and a Russian consortium led by Atomtechnoprom. Given the problems Bechtel is currently facing with a high-way project in Romania and the lack of experience of the Russian consortium with both the CANDU design as with EU regulatory practices, this looks like a pre-determined tender for SNC Lavalin.

In the mean time, Romanian NGO Terra Mileniul III discovered that EnergoNuclear contracted several consultants for the development of parts for “an adequate Environmental Impact Assessment”. This sheds doubt over the fate of the EIA that started in 2006 and that still has not been approved.

Belene, Bulgaria – power games with Russia
On 6 February, a memo from the head of Atomstroyexport Sergej Kiriyenko leaked to the French daily La Tribune in which he advised Rosatom to withdraw from the Belene project. He argued that the 200 million Euro compensation payment would be larger than the 150 million Euro Rosatom was expected to profit. A day later, however, Atomstroyexport declared during a conference in Bulgaria that it expects to start poring concrete in September of this year and denied the relevance of the leaked document. Bulgarian Prime Minster Borissov announced that when Russia will not back down on the inflation correction it agreed with his predecessor, Bulgaria will not continue with Belene. Borissov asked journalists “Are we going to lose 200 M or 2.5 B – this is the question. What funds do we have left then for construction, for providing better life to Bulgarian citizens – money for pensions, education, increase of wages, infrastructure?”

Also resistance in Serbia is growing over participation in the Belene project.

Mochovce, Slovakia – construction continuing with invalid licenses
After a groundbreaking ruling of the Aarhus Convention Compliance Committee declared three permits for changes in the Mochovce 3,4 design in breach with the Aarhus Convention because the Slovak regulator UJD had not waited for the conclusion of the ongoing EIA (see Nuclear Monitor 722), Slovenske elektrarne and ENEL continue construction. The European Commission is investigating how the ACCC ruling should be implemented and Slovakia has taken the unprecedented step to send a complaint about the ruling to the UNECE – the secretariat of the Aarhus Convention. This means that it might seek to have the judgment overturned during June's Meeting of Parties to the Convention in Chisinau, Moldava. The involved NGOs, Greenpeace Slovakia, Za Matku Zem, Global2000 and Ökobüro Wien are currently contemplating legal steps to force a halt of construction of Mochovce 3,4 and a new public participation procedure.

Temelín, Czech Republic – Five years delay in planning
The Czech electricity giant CEZ announced a five year delay for the Temelin 3,4 project. Ladislav Kriz, spokesman for CEZ that operates Temelín, said it was rather an administrative measure and that CEZ expected the project to be completed earlier.

Nuclear Energy Program, Poland – SEA confronts nuclear government with reality
On 27 December, the Polish Ministry of Economy announced a three week public consultation on Strategic Environmental Assessment of the Polish Nuclear Energy Program, to start on the 30th of December. A fast intervention from Greenpeace, followed by other NGOs, made clear to the Polish Government, that three weeks was too little under the Aarhus Convention and the EU SEA Directive for proper public participation on the basis of the 1205 pages of documentation issued by the Ministry. It also pointed out a transboundary assessment had to be made. The Ministry not only had to extend the term for public input to three months (ending 31 March 2011), but also announced a transboundary procedure, though no time-line has been published for this so far.

The delivered environmental assessment fails among others to properly address alternatives, the issue of radioactive waste and is inadequate concerning the possible effects of large accidents and security, so that further delays can be expected.

The potential operation date for the first Polish nuclear power plant already has been postponed from 2020 to 2022.

Source and contact: Jan Haverkamp, Greenpeace EU policy campaigner dirty energy expert on energy issues in Central Europe, Tel. +32 2 27419 21
Email: jan.haverkamp@greenpeace.org


Energy for the Future?

A new publication from the Heinrich Boell Stiftung, WISE Brno and Hnuti DUHA / FoE CZ describes the nuclear lobby and its influence on energy policies in Central Europe (Czech Republic, Slovakia, Poland, Hungary and Bulgaria).

It is available for download at: http://www.boell.cz/navigation/65-962.html

 

In brief

Nuclear Monitor Issue: 
#684
25/02/2009
Shorts

U.K.: What's in our dump?

The operators of the Drigg national low-level waste facility have asked former workers to tell them what is buried there. In an advert in local papers LLW Repository Limited asked workers who tipped nuclear waste into the site's open trenches over a 25-year period from 1960 to try and remember what it was they dumped. The company said it did have records of what was dumped but they wanted "a clearer picture".

Cumberland News 14 February 2009


Greenpeace: illegal state aid Romania and Bulgaria.

On February 25, Greenpeace has filed complaints to the European Commission over alleged illegal state aid for the construction of two nuclear reactors in Romania and two in Bulgaria. The environmental organization argues that both countries violate EU competition rules. Jan Haverkamp, EU energy campaigner for Greenpeace, said: "We have been investigating for many months the unfair competition conditions that have been granted to the nuclear sector in Romania and Bulgaria. We have now submitted the evidence we have collected to the European Commission, and are calling for urgent action to correct these flagrant market distortions."

The Romanian government earmarked 220 million Euro for the Cernavoda 3 and 4 nuclear power plant. On top of this, the state spent EUR350 million in taxpayers´ money for the purchase of heavy water for the new power station, as well as EUR800 million to increase the capital of state utility S.N. Nuclearelectrica - S.A., with the purpose of supporting its financial contributions to the project.

The Bulgarian government has invested 300 million Bulgarian Leva (154 million Euro) in state utility NEK for the construction of the Belene nuclear power station, as well as another 400 million Leva (205 million Euro) in NEK's parent holding BEH, partly also meant for Belene. According to Greenpeace, all of these investments are in violation of EU competition law.

Press release, Greenpeace EU Unit, 25 February 2009


EDF debt increased to nearly 25 billion Euro.

French energy group and the world’s biggest operator of nuclear power stations, EDF could be forced to sell some of its power stations in France to help to fund its £12.2 billion acquisition of Britain’s nuclear industry. EDF shocked investors by unveiling a fall of nearly 40 per cent in annual profits (slipped to 3.54 billion euro in 2008, compared with 5.6 billion Euro in 2007) and warning that its debt pile had increased to nearly €25 billion (US$ 32 billion) after a string of acquisitions, including those of British Energy and America’s Constellation Energy.

EDF, which is 85 % owned by the French State, is aiming to cut its debt by at least 5 billion Euro by the end of 2010 and much of this would be achieved through asset sales. A number of foreign energy companies, including Enel, of Italy, have previously expressed an interest in entering the French power market.

The Times (U.K.), 13 february 2009


GDF Suez pulls out of Belene!

An important victory and another sign that the Belene project is too risky! French utility GDF Suez has decided to pull out of Bulgaria's planned nuclear plant of Belene. GDF Suez's Belgian subsidiary Electrabel had been in talks to take part in German utility RWE's 49-percent stake in Bulgaria's 4 billion Euro plant. RWE confirmed it had not reached an agreement with GDF Suez but said it would continue to develop the project as planned. "Financial, technical, economic and organization questions are in focus and safety of course comes first in all our considerations," a RWE spokesman told Reuters. Sources familiar with the Bulgarian nuclear project have said the global financial crisis and tighter liquidity have made raising funding extremely difficult and that it was likely the plant's starting date would go beyond the planned 2013-2014.

GDF Suez is focusing on its other nuclear projects, a company spokesman said. The company is trying to grab a share of the nuclear revival with plans to take part in the second and possibly the third new-generation French nuclear reactors as well as in nuclear power projects in Britain, Romania and in Abu Dhabi.

Reuters, 28 February 2009


More delays for Rokkasho.

The commercial start-up of Japan’s Rokkasho reprocessing plant has suffered a further delay. On January 30, its owner, Japan Nuclear Fuel Ltd (JNFL), filed an application with the Ministry of Economy, Trade and Industry (METI) to change its construction plan, pushing the scheduled completion date of the plant back to August 2009. A few years ago JNFL had planned to commence full operation of the plant in November 2007.

Groups and individuals have been campaigning against this plant ever since 1985, when Aomori Prefecture agreed to allow it to be constructed. If the Rokkasho reprocessing ever operates at full capacity, it will reprocess 800 tons of spent fuel and extract about 8 tons of plutonium per year. In the course of regular operations, when spent fuel assemblies are cut up (shearing), radioactive gases are released from the chimney stack. These include radioactive isotopes of krypton, xenon, iodine, cesium, etc.. Later in the process, other radioactive materials are released into the sea as liquid waste. These include tritium, carbon-14, iodine-129, plutonium, etc.. It is said that a reprocessing plant releases as much radioactivity in one day as a nuclear reactor releases in one year.

In addition, there are international concerns that the operation of the Rokkasho reprocessing plant will accelerate trends towards nuclear proliferation. The process used at Rokkasho will produce a 1:1 mixed oxide of plutonium and uranium. The Japanese government says that it is difficult to produce nuclear weapons from this. However, this is not true. Scientists in the US, and also the International Atomic Energy Agency, recognize that this material can readily be transformed into nuclear weapons.

Nuclear Engineering International, 18 February 2009 / Nuke Info Tokyo (CNIC)


U.K.: Leaked for 14 years.

Radioactive waste leaked from a decontamination unit at the Bradwell nuclear power station for 14 years, Chelmsford Crown Court was told late January. The operators, Magnox Electric, were found guilty of allowing unauthorized disposal of radioactive waste from 1990 to 2004 when the problem was discovered. The court was told the leak was caused by poor design and no routine inspection or maintenance. Chief inspector for the Nuclear Installations Inspectorate, Mike Weightman, said it was not possible to "inspect or check every feature of a complex plant" but once the leak was discovered regulators took quick action.

N-base 601, 11 February 2009


Iraq takes first step to nuclear power, again….

On February 22, Iraqi Electricity Minister Karim Wahid says Baghdad is taking initial steps to construct the country's first nuclear power plant in cooperation with France. "I am willing to enter into contacts with the French nuclear agency and to start to build a nuclear power plant, because the future is nuclear," said Wahid. Iraq had sealed a contract with France to construct a nuclear reactor during Saddam Hussein's regime in 1976. The construction of the Osirak reactor however remained unfinished after Israeli warplanes bombed the facility in 1981. Tel Aviv accused the regime of building nuclear weapons. In the 1990 Iraq was accused of having a secret nuclear weapons program. Already in 1991 in the first few days of Gulf War I Iraqi nuclear energy capability (research reactor, hot-cells, etc.) was said to be destroyed by the US-led international coalition. However, in the decade that followed Iraq was still accused of having a covert nuclear program, but in search of such a program, after the Gulf War-II in 2003 nothing was found.

Press TV (Iraq), 22 February 2009 / Laka Foundation, sources 1992 & 2003


France: TV show reveals radioactive risk.

Fears that radioactive material taken from France’s old uranium mines has been used in construction have been raised by a TV documentary. According to investigators for the program Pièces à Conviction (Incriminating evidence), there are many sites where radioactive material is a potential health risk including schools, playgrounds, buildings and car parks. Very little uranium is now mined in Europe, but France carried out mining from 1945 – 2001 at 210 sites which have now been revealed by IRSN, the Institute of Radioprotection and Nuclear Safety on its website. Problems stem from millions of tons of reject rock which contained small amount of uranium which are still stocked at some of the sites along with 50 million tons of waste from extraction factories.
The documentary on France 3 also revealed that some reject rock has also been used as construction rubble in areas used by the public, that there have been some radioactive leaks into the environment from waste and that some “rehabilitated” areas where building has been taken place had been contaminated with radon. Before the program went out Areva had lodged a complaint about it with the Conseil Supérieur de l’Audiovisuel concerned that its intention was to make accusations against the firm. The program makers said they had “opened a national debate on uranium waste in France”.

The Connection (Fr.), 13 February 2009


Largest Pu transport ever from Europe to Japan.

Secret preparations are underway in Britain and France for shipping 1.8 tons of plutonium, the largest quantity of plutonium ever shipped by sea. The plutonium is contained in 65 assemblies of MOX (mixed plutonium and uranium oxide) fuel and is being shipped to Japan for use in the nuclear power plants of three Japanese electric utilities. No details have been revealed, but it is reported that the fuel will be transported by two British-flagged vessels, escorting each other.

The vessels are to depart Europe anytime on or after March 1st. Neither the hour of departure nor the maritime route to be used will be revealed before the ships depart. The United States must approve the transport plan before the shipment can proceed. The MOX fuel to be transported has been fabricated in France by Areva NC. The three possible routes for the shipment are around the Cape of Good Hope and through the South Pacific, around South America, or, through the Panama Canal.

Japanese electric utilities hope the fuel to be shipped will start its troubled MOX fuel utilization program which was to begin a decade ago in 1999. Many more shipments are scheduled to follow and could take different routes.

Green Action (Japan) Press Release 24th Feb 2009


IAEA: Syrian uranium-traces manmade.

The International Atomic Energy Agency (IAEA) has said traces of uranium taken from the site of an alleged nuclear reactor in Syria were manmade. The report by the IAEA on the Dair Alzour site puts strong pressure on Damascus as it rejects the Syrian explanation for the presence of uranium.

The IAEA-report says that after an initial visit in June 2008, which revealed the presence of processed uranium, inspectors had not been allowed back to Dair Alzour and other sites where debris might have been stored, on the grounds they were "military installations".

IAEA denounces the Syrian government for its lack of cooperation with the agency's inquiry. "Syria has stated that the origin of the uranium particles was the missiles used to destroy the building," the IAEA report says. "The agency's current assessment is that there is a low probability that the uranium was introduced by the use of missiles as the isotopic and chemical composition and the morphology of the particles are all inconsistent with what would be expected from the use of uranium-based munitions."

The IAEA says Israel also failed to cooperate, but its findings give weight to the Israeli and US allegation that Dair Alzour was a secret reactor intended for eventual production of weapons. The report explicitly questions Syria's denials.

Circulation of the IAEA-report is restricted; it cannot be released to the public unless the IAEA Board decides otherwise. However, it can be found at: http://isis-online.org/publications/syria/IAEA_Report_Syria_Feb_2009.pdf

Guardian, 19 February 2009